Packing her up for trucking

Posted by on Oct 9, 2013 in blog | No Comments
Packing her up for trucking

Took 3 days to take everything off Anahata’s deck so that she would fit under the bridges. the height requirement was 12′ 6″. It meant that we had to remove pushpit, pullpit, radar arch, dodger, Bimini, Boom Gallows and all the stanchions. The Port Annapolis Marina help taking down the mast, after which I was able to take it apart completely and wrap it with foam padding followed by shrink wrap. All the shrouds were bailed and put on a skid for transporting.

 

Leave a Reply